Contract for Building Construction This Contract is made by and between Garden South Construction (the Company) and Garden North Construction (the Client). 1. Scope of Work The Company is responsible for building a new commercial building for the Client, including land excavation, site preparat......

Contract for Building Construction

This Contract is made by and between Garden South Construction (the Company) and Garden North Construction (the Client).

1. Scope of Work

The Company is responsible for building a new commercial building for the Client, including land excavation, site preparation, concrete foundation, and framing, as outlined in detail in the Statement of Work annexed herewith and incorporated herein by reference.

2. Timeframe

The Company is to complete the construction project within two (2) months from the date of project commencement.

3. Payment

Payment shall be made in two installments:

(a) The first installment will be fifty percent (50%) of the total bid price and shall be due upon project commencement;

(b) The second installment will be fifty percent (50%) of the total bid price and shall be due upon completion of the project.

4. Warranty

The Company agrees to provide a one-year warranty for the building structure and construction services provided, commencing from the date of project completion.

5. Indemnification

The Company agrees to hold harmless, defend and indemnify the Client from and against all claims, actions or liabilities incurred by or arising out of the Company’s work on the building construction project.

6. Termination

Either party may terminate this contract upon thirty (30) days written notice.

IN WITNESS WHEREOF, the parties have caused this contract to be executed on the date first set forth above.

Garden South Construction

By: ___________________________________

Name: ________________________

Title: ___________________________

Garden North Construction

By: ___________________________________

Name: ________________________

Title: ___________________________

Put Away Put Away
Expand Expand
Finance and Economics 3239 2023-07-08 1033 RadiantGlow

This Contract is made on ___(date)___ by and between ________ (hereinafter referred to as the “Owner”) and ________ (hereinafter referred to as the “Contractor”) Article 1. Project Description The Contractor agrees to take full responsibility for the design, construction and completion of th......

This Contract is made on ___(date)___ by and between ________ (hereinafter referred to as the “Owner”) and ________ (hereinafter referred to as the “Contractor”)

Article 1. Project Description

The Contractor agrees to take full responsibility for the design, construction and completion of the construction project (hereinafter referred to as the “Project”) as defined below:

___(Describe the project in detail)___

Article 2. Term of this Contract

This Contract shall be effective from _____(date)_____ and shall remain in effect until the completion of the Project or until the fulfillment of the Contractor’s obligations.

Article 3. Specifications

The Contractor shall comply with the following specifications:

___(Describe the specifications of the Project in detail)___

Article 4. Cost

The total cost for the completion of the Project shall be _____(amount)_____, payable in installments as specified in this Contract. The cost breakdown is as follows:

___(List the cost breakdown)___

Article 5. Payment

The Owner shall make payments in the manner specified in this Contract.

Article 6. Responsibilities

The Contractor shall be solely responsible for the design, construction, and completion of the Project in accordance with the specifications set forth in this Contract.

The Owner shall be responsible for the payment of the Contractor in accordance with the provisions of this Contract.

Article 7. Dispute Resolution

In the event of a dispute arising from this Contract, the parties shall attempt to reach an agreement by mutually acceptable means first. If no agreement can be reached, the parties agree to refer the matter to arbitration.

Article 8. Termination

Subject to the provisions of this Contract, either party may terminate this Agreement upon _____ (number)_____ days prior written notice.

In Witness Whereof, the parties have executed this Contract on the date first written above.

Contractor:

Owner:

Put Away
Expand

Commenta

Please surf the Internet in a civilized manner, speak rationally and abide by relevant regulations.
Featured Entries
ship board
24/06/2023
low alloy steel
13/06/2023