Alloy tool steel wire (YB/T095-1997)

Wire 76 1025 Sophie

翻译 Alloy Tool Steel Wire (YB / T095-1997) 合金工具钢丝(YB/T095-1997) This Standard specifies the designation,ordering information, dimensions, shape, weight and permissible deviation, technical requirements, test and inspection rules, packaging, mark and quality certificate of alloy tool stee......

翻译

Alloy Tool Steel Wire (YB / T095-1997)

合金工具钢丝(YB/T095-1997)

This Standard specifies the designation,ordering information, dimensions, shape, weight and permissible deviation, technical requirements, test and inspection rules, packaging, mark and quality certificate of alloy tool steel wire.

本标准规定了合金工具钢丝的牌号、订货信息、尺寸、形状、重量及其允许偏差、技术要求、试验检验规则、包装、标志和质量证明书。

This Standard applies to the alloy steel wire made of alloy tool steel.

本标准适用于由合金工具钢制成的合金钢丝。

The chemical composition of alloy tool steel wire should meet the requirements of Table 2.

合金工具钢丝的化学成分应符合表2 中的要求。

The temperature of finished wire should be lower than 850℃.

成品钢线的温度应低于850℃。

The surface quality of alloy tool steel should be in accordance with the requirements of Table 3.

合金工具钢的表面质量应符合表3的要求。

The roundness, ovality and surface crack of alloy tool steel wire shall meet the requirements of Table 4.

合金工具钢丝的圆度、椭圆度和表面裂纹应符合表4的要求。

The quality inspection of finished wire should be carried out according to the requirements of Table 5.

成品钢线的质量检验应按表5的要求进行。

The manual delivery device shall meet the requirements of Table 6.

手动抛送装置应符合表6的要求。

The torsional deformation test of alloy tool steel wire should be carried out according to the requirements of Table 7 and Table 8.

合金工具钢丝的扭转变形试验应按表7和表8的要求进行。

The padding form and requirements of the package should meet the requirements of Table 9.

包装的充填形式及要求应符合表9的要求。

The mark requirements and quality certificate of alloy tool steel wire should meet the requirements of Table 10 and Table 11.

合金工具钢丝的标志要求和质量证明书应符合表10和表11的要求。

Put Away Put Away
Expand Expand

Commenta

Please surf the Internet in a civilized manner, speak rationally and abide by relevant regulations.
Featured Entries
two stage bidding
03/07/2023
slip
13/06/2023