Construction of Composite Floor Slab Composite floor slabs, also known as ribbed floor slabs, are reinforced concrete floor slabs consisting of profiled steel decking and a concrete topping. Commonly employed in the construction of industrial and commercial buildings, this type of floor system ha......

Construction of Composite Floor Slab

Composite floor slabs, also known as ribbed floor slabs, are reinforced concrete floor slabs consisting of profiled steel decking and a concrete topping. Commonly employed in the construction of industrial and commercial buildings, this type of floor system has several advantages over the more traditional solid slabs including reduced deadweight, improved spans, enhanced acoustic and thermal performance, and increased structural efficiency.

The process of constructing a composite floor slab typically involves three stages: decking laying, reinforcing installation, and pouring of the concrete topping. Although the exact process may vary, the steps outlined below provide a general overview of the entire construction process.

Step 1: Decking Laying

Before the installation of the steel decking, the area must be appropriately prepped in order to ensure that it is level, free of debris, and clear of any obstructions. This can be done by removing existing materials and laying the base layer of concrete. Once the base layer is in place, the steel decking can then be laid out and fastened using either self-drilling screws or welded clips. The decking profile is critical for the floor slab’s performance, so it’s important that the correct type and shape is used for the specific application.

Step 2: Reinforcing Installation

Once the decking is in place, the reinforcing steel can then be installed. Steel reinforcing bars, or ‘rebars’, must be placed in a grid pattern based on the span requirements of the slab and the lead times of the steel decking. Once installed, the rebars must be properly secured with the use of strong mesh and binding wires.

Step 3: Concrete Pouring

Once the reinforcing steel is securely in place, the poured concrete can be designed to the correct thickness and finish level. This may require a formline to be created in order to support the concrete while it sets. In order to safely vibrate the concrete throughout the entire slab, specialised equipment such as a concrete pump or vibrator must be used.

Step 4: Finishing

The final step after the concrete has had time to cure is the finishing. Depending on the required finish, this may involve the use of a concrete power trowel or shot blasting. Alternatively, the surface may need to be sealed to prevent the concrete from weathering, staining or becoming slippery.

The construction of composite floor slabs is a labour intensive process which requires specialized knowledge and equipment. However, when correctly constructed, a composite floor slab can provide superior performance and longer lasting results than traditional solid slabs.

Put Away Put Away
Expand Expand
other knowledge 456 2023-06-23 1067 海蓝星 (Sea Blue Star)

Composite floor construction process Composite floors are common in modern construction. They are composed of a variety of materials such as steel, concrete, and timber. The process of constructing a composite floor is complicated, including the selection of materials, the preparation of building......

Composite floor construction process

Composite floors are common in modern construction. They are composed of a variety of materials such as steel, concrete, and timber. The process of constructing a composite floor is complicated, including the selection of materials, the preparation of building sites and the cutting of components. Therefore, it is important to abide by the principles of technology in the construction process.

Firstly, the site layout should be carried out according to the dimensions of the building. The dimensions of the composite deck should be determined according to the requirements of design drawings, and the layout should be carried out accurately. Secondly, the base of the composite deck should be made level and the waterproof layer must be laid to prevent the moisture of the ground to affect the structural stability.

Thirdly, when laying the steel beams, attention should be paid to the installation size, connection mode, and position to ensure the stability of the entire steel structure. Then the steel distribution board can be installed correctly and firmly. Finally, the timber flooring should be placed in the original position. The rigidness and wearing resistance of the timber flooring should be checked before installation.

In conclusion, the construction of composite floors needs to go through a complicated process. Therefore, the construction teams should strictly abide by the construction process to ensure the accuracy and stability of the floorings.