Non-ferrous metal tube mill installation

把装机步骤翻译成英文 Installation of Cold-Rolled Colored Metal Tubes The installation of cold-rolled colored metal tubes is a complicated process, requiring detailed knowledge and expertise. To ensure a successful installation, the following steps should be followed: 1. Before installation, ensu......

把装机步骤翻译成英文

Installation of Cold-Rolled Colored Metal Tubes

The installation of cold-rolled colored metal tubes is a complicated process, requiring detailed knowledge and expertise. To ensure a successful installation, the following steps should be followed:

1. Before installation, ensure that the foundation has been properly and level configured. Take accurate measurements to verify the correct positioning of the machine-base units before proceeding.

2. Install the main base and support frames, ensuring that all the assemblies are firm and secure. The core assembly should be placed in the center of the base with the frames in the right place and at the right measurements.

3. The drive and regeneration system should be placed and fixed into the main base following careful instructions and diagrams.

4. Reinforce the frames with diagonal crosskeying, then install the upper and lower roller frames to the drive system. Securely tighten all the bolts and screws.

5. The transmission system should also be installed into position. Check for a secure fit and make sure that the transmission is dust-proof.

6. Install the pressing rollers into the drive system in the specified rotation direction. Measure the pressure generated by the roller assembly and ensure that it is within the required tolerance.

7. Prepare the working frame depending on the pipe’s length. Adjust the frame to ensure that it supports the colored metal pipes correctly.

8. Connect the main components of the drive system, and check for sufficient motor power to power the whole machine. Make sure that all the motors are running correctly and in synchrony.

9. Install the oil system, adjusting the pressure and temperature gauges according to the machine’s operation requirements.

10. Once the installation is complete, commission the system and test the appropriate parameters before running the cold-rolled colored metal pipes in the machine.

Put Away Put Away
Expand Expand

Commenta

Please surf the Internet in a civilized manner, speak rationally and abide by relevant regulations.
Featured Entries
ship board
24/06/2023
two stage bidding
03/07/2023
Composite steel
13/06/2023