K352CXJ Operation Procedure
This document provides an overview of the operation procedure when using this K352CXJ machine. Familiarity with this machine and its features will help ensure efficient and safe operation of it.
1. Preparing for Operation
Before the machine is started, the operator must perform a safety check to ensure the machine is properly assembled, lubricated, and all guards and safety devices are in place. Electrical connections must be checked as well. Also, items like the coolant level, oil level, chip conveyor, and power supply should be checked to confirm that the machine is ready for operation.
2. Starting the Machine
To start the machine, the operator must press the start button. This will cause the coolant pump to begin running and the spindle to move. The coolant should then be sprayed onto the workpiece. Once the coolant is running, the operator should check the spindle and tooling to ensure they are in proper alignment and secure.
3. Setting Parameters and Tooling
Once the spindle and tooling are in proper alignment, the operator must set the machine parameters and tooling accordingly. This includes setting the cutting speed, feed rate, and tool size. The operator should ensure that the tooling is secure and the spindle is turning in the correct direction before proceeding.
4. Loading and Unloading
Once the parameters and tooling are set, the operator can begin loading and unloading the workpiece on the machine. The operator must make sure that the workpiece is properly aligned and secure before turning on the machine. To unload the workpiece, the operator must turn off the machine and move the workpiece away from the spindle.
5. Running the Machine and Monitoring it
Once the machine is on, the operator must keep a close eye on the feed rate, tool wear, and coolant levels. The operator must also monitor the machine to ensure there isn’t an overload. If the machine begins to overheat, the operator must immediately turn off the machine and let it cool down before proceeding.
6. Finishing Up
When the job is finished, the operator must turn the machine off, unload the workpiece, and clean up any chips and other debris. The machine should then be inspected to ensure all components are in proper working condition and lubricated. The operator must also check for any coolant leaks and replace worn parts as needed.
These steps should be followed when using the K352CXJ machine to ensure efficient, safe operation. Proper training and familiarity with the machine and its components is essential for safe operation. After following the steps outlined in this document, the operator should be able to operate the machine efficiently and safely.